Page 10 - SureCav Design Handbook 2018
P. 10

Page |   10                                  Quick Facts

    Damp Proof Course                             ● Install DPC 150mm min. above ground level

    Standard and Preformed DPC                    ● Trim the SureCav panels to the tray
                                                  ● Suitable for site-made or custom tray





























                  Standard DPC                         DPC or custom tray

    General Notes:
    1.  Standard DPC installed 150mm min.
       above ground level.

    2.  SureCav panels can also be fitted below
       DPC if required for support for the
       construction of the stone, flint or other
       masonry.

    3.  Trim the SureCav panels horizontally to
       meet the DPC Tray and continue the sheet
       the other side of the tray.

    4.  Install weep/air vents as required by local
       authority.

    5.  Wall-ties should meet standards approval
       by local authority, structural engineer
       and/or architect.
   5   6   7   8   9   10   11   12   13   14   15