Page 10 - SureCav Design Handbook 2018
P. 10
Page | 10 Quick Facts
Damp Proof Course ● Install DPC 150mm min. above ground level
Standard and Preformed DPC ● Trim the SureCav panels to the tray
● Suitable for site-made or custom tray
Standard DPC DPC or custom tray
General Notes:
1. Standard DPC installed 150mm min.
above ground level.
2. SureCav panels can also be fitted below
DPC if required for support for the
construction of the stone, flint or other
masonry.
3. Trim the SureCav panels horizontally to
meet the DPC Tray and continue the sheet
the other side of the tray.
4. Install weep/air vents as required by local
authority.
5. Wall-ties should meet standards approval
by local authority, structural engineer
and/or architect.